Whiteman Road KPS Culvert Replacement (CRP 5829)

5829ProjectHeaderPhoto.jpg
Location pin
Camera
Rolled up paper icon

What's Happening


Engineering: Pierce County is in the early stages of design engineering for the project. Currently we are gathering information about the existing conditions.

Land: Right-of-Way and/or Temporary Easement needs will be evaluated.

Survey: A topographic survey will be required.

Environmental:
Necessary environmental permits will be obtained.

Geotechnical:
A geotechnical study will be performed.

About the Project


Planned improvements for Whiteman Road KPS - Culvert Replacement (CRP 5829) are intended to replace a failing culvert under Whiteman Road KPS. Improvements will include the following:
  • Replace the existing failing culvert under Whiteman Road KPS just south of Whiteman Cove Road KPS with a steel plate arch culvert of an approximate span of 14 feet.

Project Timeline


Summer 2019: Project construction

December 2019: Open to traffic