160th Street East - 330' E/O SR-161 to John Bananola Way E (CRP 5767)

5767 ProjectHeaderPhoto.jpg

What's Happening


Pierce County hosted a Pre-Construction Meeting on May 9, 2017 and issued a Notice to Proceed on May 15, 2017. The contractor, Axum General Construction, Inc. will be on site performing the following work:
  • Grading for curb/gutter installation
  • Luminaire installation
  • Pervious sidewalk installation

About the Project

 
Planned improvements to 160th Street East from 330' e/o SR 161 to John Bananola Way East (CRP 5767). 
Improvements will include the following:
  • Widening of the existing roadway 
  • Installation of cement concrete traffic curb and gutter 
  • Installation of pervious sidewalk 
  • Modifications of existing storm drainage, cement concrete approaches, cement concrete ramps, and illumination and interconnect systems. 

Project Timeline



March 10, 2017: Bid Opening

March 31, 2017: Pierce County awarded the project to Axum General Construction, Inc 

May 9, 2017: Pierce County hosted the Pre-Construction Meeting 

May 15, 2017: Pierce County issued the Notice to Proceed 

July 2017: Anticipated Substantial Completion

August 2017: Anticipated Physical Completion


Contact Us
Send a message arrow
Henry Gertje, P.E.
Construction Supervisor
Phone: (253) 798-6826
Axum General Construction, Inc.
Contractor
Phone: (206) 786-5383
Address:
4301 South Pine Street, Suite 628
Tacoma, WA 98409
Address:
23452 SE Daybreak Place
Maple Valley, WA 98038