160th Street East - 330' E/O SR-161 to John Bananola Way E (CRP 5767)

5767 ProjectHeaderPhoto.jpg
CivicSend Slideshow Left Arrow Slideshow Right Arrow
CivicSend Slideshow Left Arrow Slideshow Right Arrow
CivicSend Slideshow Left Arrow Slideshow Right Arrow
CivicSend Slideshow Left Arrow Slideshow Right Arrow
CivicSend Slideshow Left Arrow Slideshow Right Arrow
CivicSend Slideshow Left Arrow Slideshow Right Arrow
CivicSend Slideshow Left Arrow Slideshow Right Arrow

What's Happening


Pierce County hosted a Pre-Construction Meeting on May 9, 2017 and issued a Notice to Proceed on May 15, 2017. The contractor, Axum General Construction, Inc. will be on site performing the following work:
  • Installing erosion control measures
  • Clearing and grubbing
  • Installing storm drainage

About the Project

 
Planned improvements to 160th Street East from 330' e/o SR 161 to John Bananola Way East (CRP 5767). 

Improvements will include the following:
  • Widening of the existing roadway 
  • Installation of cement concrete traffic curb and gutter 
  • Installation of pervious sidewalk 
  • Modifications of existing storm drainage, cement concrete approaches, cement concrete ramps, and illumination and interconnect systems. 

Project Timeline



March 10, 2017: Bid Opening

March 31, 2017: Pierce County awarded the project to Axum General Construction, Inc 

May 9, 2017: Pierce County hosted the Pre-Construction Meeting 

May 15, 2017: Pierce County issued the Notice to Proceed 

July 2017: Anticipated Substantial Completion 

August 2017: Anticipated Physical Completion


Contact Us
Send a message arrow
Henry Gertje, P.E.
Construction Supervisor
Phone: (253) 798-6826
Axum General Construction, Inc.
Contractor
Phone: (206) 786-5383
Address:
4301 South Pine Street, Suite 628
Tacoma, WA 98409
Address:
23452 SE Daybreak Place
Maple Valley, WA 98038