12th Avenue South / 124th Street South (CRP 5877)

What's Happening


Engineering: We're beginning the design engineering for the project. Currently we're gathering information about the existing conditions and initiating contact with utility companies.

Land: Most of the improvements are expected to fit within the existing right-of-way. Right-of-way acquisitions may be necessary in limited locations.

Survey: County surveyors will be in the area gathering field data of the project area.

About the Project


Planned improvements to 12th Avenue South and 124th Street South (CRP 5877) are intended to increase overall pedestrian safety, mobility, and ADA accessibility within the project limits. The improvements would include the following:

  • Installing new sidewalk on the north side of 124th Street South between 12th Avenue South and 10th Avenue South, and on the east side of 10th Avenue South between 123rd Street South and 124th Street South.
  • Providing illumination on 124th Street South.
  • Installing a pedestrian crossing beacon and illumination at the existing marked crosswalk.
  • Adding a new marked crosswalk across 12th Avenue South just north of 123rd Street South.

Project Timeline


March 2018 to March 2020: Field data collection, engineering design, right-of-way plans, environmental documentation, construction plans, specifications, and estimate.

March 2020: Project Advertisement