Preconstruction meeting scheduled for March 27, 2017
About the Project

The Contractor, Ceccanti, Inc., is replacing existing emergency natural gas generators at four sanitary sewer pump stations located throughout the City of Lakewood with new diesel generators. The work also includes replacement of electrical cabinet enclosures and installation of water backflow prevention devices, temporary generators, and removal of said temporary generators upon start-up of the new generators. 

This is Phase 6 of a preservation project that will replace emergency generators at 28 pump station sites within the ULID 73-1 service area. The generators are used during power outages to keep the sewage pump station in service and avoid a possible wastewater overflow. 

The existing generators were installed between 1983 through 1986, and have reached the end of their expected useful life.  Lack of replacement parts and manufacturer’s service technicians make these generators extremely difficult to maintain and create an unnecessary weak link in the collection system. Installing diesel generators will improve the strength of the collection system, reduce noise levels and reduce the cost of operating the pump stations.
                                 

Project Locations Anticipated Construction Dates
Pump Station #50 Ponce de Leon
10429 Brooklane SW
Spring/Summer 2017—TBD
Pump Station #54 Cal-Mar
950 112th St. SW
Spring/Summer 2017—TBD
Pump Station #61
Chambers Creek

7201 Steilacoom Blvd. SW
Spring/Summer 2017—TBD
Pump Station #65 Topaz Drive
6821 Topaz Dr. SW
Spring/Summer 2017—TBD


Project Funding

Total Project Cost: Approximately $440,000

Project Funding Sources: Funded by sewer ratepayer fees

Construction Contractor: Ceccanti, Inc.

Project Timeline 

Begin Construction: April, 2017

Anticipated Completion Date: September, 2017


Contact Us


Construction Engineering Supervisor
Jeff Roscoe, P.E.
Email Jeff Roscoe
Ph: (253) 798-2119


Design Engineering Supervisor
Andrew Perez, P.E.
Email Andrew Perez
Ph: (253) 798-3011