Phillips/Alard Pump Station Rehabilitation

Alard Pump Station
The Contractor, Colvico, Inc., is replacing an existing standby generator located at the Phillips Siphon station (click here to view location map). The work also includes replacement of underground vaults, aging electrical panels, fencing, the permanent removal of an unused fiberglass structure and new paving. 

The existing generators have reached the end of their expected useful life and can no longer be maintained with available parts. The generator is used during power outages to keep the sewage pump station in service and avoid a possible wastewater overflow.  

Project Funding


Phillips/Alard Pump Station Rehabilitation —Project P-110383

Total Project Cost:

Approximately $337,500

Project Funding Sources:

Funded by sewer ratepayer fees

Construction Contractor:

 Colvico, Inc.

Project Timeline 


Begin Construction:

Spring 2018

Anticipated Completion Date:

September 2018